Solar alone shuts down in an outage — that is a safety rule, not a fault. A battery and a backup panel keep the short list running: fridge, well pump, a few sockets and the router.

What the job includes
- 13.5 kWh battery and backup sub-panel
- Automatic peak-hour shifting
- Critical-loads list agreed before install
- Seamless switchover, no generator noise
- App control with reserve settings
- Battery-ready wiring if you add it later