Get a quote
Manufacturing plant with cooling stacks at first light
Aerial view of an industrial manufacturing site
Operators running machinery inside a production hall
Contract manufacturing since 1998

We build the parts
that hold tolerance
under load.

Forty-two CNC cells, a 60,000 sq ft fabrication bay and in-house metrology under one roof — so your print becomes a first article in fourteen days, not fourteen weeks.

60,000 sq ft fabrication bay

Fabrication that
arrives square
and stays square.

A 60,000 sq ft bay with fibre laser, a 400-ton brake and structural welding under 20-ton cranes — heavy work handled without a single outside process.

Assembly and line-side kitting

Assembly, tested,
kitted and shipped
to your line.

Mechanical and electro-mechanical build with torque logging and functional test, crated to your spec so your line opens one box and starts working.

01 / 03
Halverson Turbine Ridgeline Energy Nortrack Rail Vale Motorworks Ashgrove Aero Pemberton Hydro Kestrel Systems Dunmore Marine
0 CNC cells

Three, four and five-axis, two manned shifts plus lights-out.

0 M Parts shipped a year

Single prototypes through to 25,000-piece production lots.

0 % On-time delivery

Rolling 24-month average across every active program.

0 Years on the floor

Same family ownership since the first mill landed in 1998.

Two operators in protective gear running a production machine
Welder striking an arc on a steel weldment
27 Years of production
Who we are

A job shop that grew up into a manufacturing partner.

Calderworks opened in 1998 with four people taking overflow work from the valley's turbine plants. We kept the habits that made those first customers stay — answer the phone, quote in two days, own the mistake — and added the equipment, systems and certifications needed to carry a program from print to pallet.

Machining, fabrication, finishing and assembly all happen in the same building in Springfield. One supplier, one quality record, and no handoff where a tolerance quietly goes missing.

What we promise

A quote inside 48 hours, a schedule we hold, and a part that passes inspection the first time.

Where we're going

Full digital traceability on every part we ship by 2028 — barcode back to raw heat lot, no paper in between.

Start a program
Marta Calder President, second generation
What we run

Six capabilities,
one quality record.

Every process below is owned in-house and measured against the same print. Nothing leaves the building for a step we can do ourselves.

Service lines

Built around the way
a program actually runs.

Prototype, launch, production, aftermarket — different problems, different teams. Pick the stage you're in.

All service lines
Wide view of a factory floor with machinery and staged crates

Precision CNC Machining

  • 5-axis envelope to 1,200 mm
  • Held to ±0.0002 in
  • Lights-out third shift
Read more

Sheet Metal & Heavy Fabrication

  • Fibre laser to 1 in mild steel
  • 400-ton brake, 14 ft bed
  • AWS D1.1 certified welders
Read more

Robotic Welding Cells

  • Aluminium, steel and stainless
  • Weld map recorded per part serial
  • In-cell dye penetrant check
Read more

Finishing & Coating

  • Type II and Type III anodize
  • Salt-spray tested to 1,000 hours
  • Colour matched to RAL
Read more
Instant estimate

Get a number before
you get a quote.

Pick a process, a material and a quantity. This gives you the indicative unit band and lead time we would open a conversation with — the same logic our estimators start from before they open your file.

  • Ranges reflect current mill pricing and our live floor loading.
  • A firm quote comes back within two business days of your print.
  • No minimum order on prototype and first-article work.

Estimate a job

Indicative unit —
Lead time —

Indicative only. Geometry, tolerance and finish move the number — send the print and we'll firm it up.

Send this print to an engineer
Print to pallet

Six gates, and you can
see where your job sits.

Every job moves through the same six gates. You get a named engineer at gate one, and the same person answers at gate six.

01

Print review and quote

Send a STEP file or a PDF. An engineer reviews the GD&T, flags anything that will fight the process, and prices it.

Turnaround · 2 days
02

Design for manufacturing

We propose changes that cut cost without touching function — a radius here, one less setup there. You approve each one.

Turnaround · 3 days
03

Tooling and fixturing

Programs written, fixtures cut in-house, cycle proven on a dry run before a single piece of your material is touched.

Turnaround · 5 days
04

First article and sign-off

One part, fully measured, with a dimensional report against every ballooned feature. Production waits for your approval.

Turnaround · 4 days
05

Production run

Scheduled against your release dates with in-process checks at set intervals. Run rates appear in your portal daily.

Rate · to 1,200 pcs/day
06

Inspection, kitting, ship

Final inspection, certificates packed with the parts, crated to your spec and released to your carrier or ours.

Docs · CoC + material certs
Where our parts end up

Four sectors that don't
tolerate a bad part.

Each of these programs carries its own paperwork, its own audit and its own failure cost. We staff for that difference instead of treating every order the same.

Industrial process pipework inside an energy plant

Energy & turbines

Manifold and valve bodies, blade root fixtures and service spares held on our shelf so an outage doesn't wait on a mill.

8 400 units a year Inconel & duplex Spares on standby
Production hall with structural columns and machinery

Mobility & EV

Welded battery trays and motor housings, kitted line-side and delivered against a release schedule rather than a purchase order.

24 000 units a year Robot-welded Sequenced delivery
Heavy industrial structure with metal pipework

Infrastructure

Bridge bearing plates, rail signal enclosures and galvanised structures built to hold up in weather for thirty years.

Hot-dip galvanised AWS D1.1 Third-party witnessed
Row of precision machine tools on a factory floor

Aerospace

Structural brackets and ribs with full material traceability, and first article packs that close an audit in hours instead of days.

AS9100D Heat-lot traceable ITAR registered
Selected programs

Three jobs, and what
they actually returned.

Names withheld where NDAs apply. The figures are the ones we reported to the customer at program review.

Industrial machinery and pipework inside a plant Energy
Valve bodies · 8,400 units a year

Manifold bodies for a geothermal operator

Nineteen setups collapsed to six by re-fixturing the casting. Same print, same inspection, a third less handling.

Unit cost −31%
Scrap rate 0.4%
Workers welding steel structures in a fabrication bay Mobility
Battery trays · 24,000 units a year

Welded trays for an EV platform launch

Award to line-side delivery in eleven weeks, including two robot cells commissioned specifically for the program.

Launch 11 wks
On-time 100%
Lathe cutting a metal component in a workshop Aerospace
Structural brackets · 4,100 units a year

Titanium brackets for a cabin retrofit

A full AS9102 pack on every lot, material traceable to heat number, and a first article accepted without one deviation.

FAIR accept 1st pass
Lead time −6 wks
Request for quote

Send the print. We'll tell you what it costs and what we'd change.

Upload a STEP, IGES or PDF with quantities and target dates. An engineer replies within two business days — not a form robot.

From the buyers

What supply chain teams say after the first year.

“

We moved four part numbers across as a test. They found a setup we had been paying for since 2016 and quietly removed it. The rest of the family followed within a quarter.

Dana Whitlock
Dana Whitlock Supply chain lead, energy OEM
“

Our launch date never moved. When a casting supplier slipped two weeks they re-sequenced the cell and told us before we noticed it ourselves.

Ibrahim Nasser
Ibrahim Nasser Program manager, EV platform
“

Their first article package arrived cleaner than our own template. Audit day took three hours instead of two days and nothing came back open.

Priya Raghunathan
Priya Raghunathan Quality director, aerospace tier 1
“

They quoted a job on Thursday and had a fixture on the machine the following Wednesday. Nobody else on our list moves at that speed and still passes first article.

Tomas Berglund
Tomas Berglund Head of sourcing, rail systems
“

The portal is the part my planners actually care about. They see run rates every morning and stopped chasing me for status calls.

Adaeze Okonkwo
Adaeze Okonkwo Operations director, hydro
“

A weldment came back out of flat once in three years. They collected it, rebuilt it and sent the root cause before we had raised the complaint formally.

Marcus Feld
Marcus Feld Buyer, infrastructure group
From the floor

Notes for the people
who send us prints.

Written by our process engineers, mostly after something went wrong and we worked out why.

Read every note
Common questions

Answers we give
every week.

There isn't one for prototypes and first articles — we quote single pieces every week. For production the economics usually start making sense around fifty units, and we will tell you honestly when a job belongs at a different shop.

Two business days for a standard machined or fabricated part, five for a multi-process assembly. If you need a number faster, call and we will give you a bracketed estimate on the phone.

STEP and IGES for geometry, PDF for the dimensioned print. Native SolidWorks and Inventor files are fine too. If all you have is a sample part, send it and we will reverse-engineer it on the CMM.

Yes. Most production customers run a kanban or a blanket order with monthly releases. We hold finished goods in our warehouse and invoice on release rather than on build.

We are ITAR registered with a segregated area and access-controlled data handling. Send the classification along with the print and we will confirm before quoting.

Ship it back at our cost. You get a containment response within 24 hours, a root cause within five working days, and the corrective action documented in your portal. It has happened eleven times in three years and we publish the number.