Get a quote
Sector by sector

What each sector expects from us.

Each of these programs carries its own paperwork, its own audit and its own failure cost. We staff for that difference instead of treating every order the same.

Industrial process pipework inside an energy plant

Energy & turbines

Manifold and valve bodies, blade root fixtures and service spares held on our shelf so an outage doesn't wait on a mill.

8 400 units a year Inconel & duplex Spares on standby
Production hall with structural columns and machinery

Mobility & EV

Welded battery trays and motor housings, kitted line-side and delivered against a release schedule rather than a purchase order.

24 000 units a year Robot-welded Sequenced delivery
Heavy industrial structure with metal pipework

Infrastructure

Bridge bearing plates, rail signal enclosures and galvanised structures built to hold up in weather for thirty years.

Hot-dip galvanised AWS D1.1 Third-party witnessed
Row of precision machine tools on a factory floor

Aerospace

Structural brackets and ribs with full material traceability, and first article packs that close an audit in hours instead of days.

AS9100D Heat-lot traceable ITAR registered
What we run

Six capabilities,
one quality record.

Every process below is owned in-house and measured against the same print. Nothing leaves the building for a step we can do ourselves.

Selected programs

Three jobs, and what
they actually returned.

Names withheld where NDAs apply. The figures are the ones we reported to the customer at program review.

Industrial machinery and pipework inside a plant Energy
Valve bodies · 8,400 units a year

Manifold bodies for a geothermal operator

Nineteen setups collapsed to six by re-fixturing the casting. Same print, same inspection, a third less handling.

Unit cost −31%
Scrap rate 0.4%
Workers welding steel structures in a fabrication bay Mobility
Battery trays · 24,000 units a year

Welded trays for an EV platform launch

Award to line-side delivery in eleven weeks, including two robot cells commissioned specifically for the program.

Launch 11 wks
On-time 100%
Lathe cutting a metal component in a workshop Aerospace
Structural brackets · 4,100 units a year

Titanium brackets for a cabin retrofit

A full AS9102 pack on every lot, material traceable to heat number, and a first article accepted without one deviation.

FAIR accept 1st pass
Lead time −6 wks
From the buyers

What supply chain teams say after the first year.

“

We moved four part numbers across as a test. They found a setup we had been paying for since 2016 and quietly removed it. The rest of the family followed within a quarter.

Dana Whitlock
Dana Whitlock Supply chain lead, energy OEM
“

Our launch date never moved. When a casting supplier slipped two weeks they re-sequenced the cell and told us before we noticed it ourselves.

Ibrahim Nasser
Ibrahim Nasser Program manager, EV platform
“

Their first article package arrived cleaner than our own template. Audit day took three hours instead of two days and nothing came back open.

Priya Raghunathan
Priya Raghunathan Quality director, aerospace tier 1
“

They quoted a job on Thursday and had a fixture on the machine the following Wednesday. Nobody else on our list moves at that speed and still passes first article.

Tomas Berglund
Tomas Berglund Head of sourcing, rail systems
“

The portal is the part my planners actually care about. They see run rates every morning and stopped chasing me for status calls.

Adaeze Okonkwo
Adaeze Okonkwo Operations director, hydro
“

A weldment came back out of flat once in three years. They collected it, rebuilt it and sent the root cause before we had raised the complaint formally.

Marcus Feld
Marcus Feld Buyer, infrastructure group
Request for quote

Send the print. We'll tell you what it costs and what we'd change.

Upload a STEP, IGES or PDF with quantities and target dates. An engineer replies within two business days — not a form robot.