Heavy work is handled without a single outside process. Plate arrives, gets nested and cut on the fibre laser, moves to the brake, then to a welding bay sized for structures rather than brackets.
Structural work is welded to AWS D1.1 by coded welders, with third-party witnessed inspection available on any lot. Weldments are stress-relieved and checked on a granite table before they leave.
Galvanising and coating are scheduled alongside the build, so a structure ships finished rather than sitting in a queue at somebody else’s plant.