Get a quote
Two operators in protective gear running a production machine
Welder striking an arc on a steel weldment
27 Years of production
The company

Twenty-seven years on the same floor.

Calderworks opened in 1998 with four people taking overflow work from the valley's turbine plants. We kept the habits that made those first customers stay — answer the phone, quote in two days, own the mistake — and added the equipment, systems and certifications needed to carry a program from print to pallet.

Machining, fabrication, finishing and assembly all happen in the same building in Springfield. One supplier, one quality record, and no handoff where a tolerance quietly goes missing.

What we promise

A quote inside 48 hours, a schedule we hold, and a part that passes inspection the first time.

Where we're going

Full digital traceability on every part we ship by 2028 — barcode back to raw heat lot, no paper in between.

Start a program
Marta Calder President, second generation
0 CNC cells

Three, four and five-axis, two manned shifts plus lights-out.

0 M Parts shipped a year

Single prototypes through to 25,000-piece production lots.

0 % On-time delivery

Rolling 24-month average across every active program.

0 Years on the floor

Same family ownership since the first mill landed in 1998.

What we run

Six capabilities,
one quality record.

Every process below is owned in-house and measured against the same print. Nothing leaves the building for a step we can do ourselves.

Print to pallet

Six gates, and you can
see where your job sits.

Every job moves through the same six gates. You get a named engineer at gate one, and the same person answers at gate six.

01

Print review and quote

Send a STEP file or a PDF. An engineer reviews the GD&T, flags anything that will fight the process, and prices it.

Turnaround · 2 days
02

Design for manufacturing

We propose changes that cut cost without touching function — a radius here, one less setup there. You approve each one.

Turnaround · 3 days
03

Tooling and fixturing

Programs written, fixtures cut in-house, cycle proven on a dry run before a single piece of your material is touched.

Turnaround · 5 days
04

First article and sign-off

One part, fully measured, with a dimensional report against every ballooned feature. Production waits for your approval.

Turnaround · 4 days
05

Production run

Scheduled against your release dates with in-process checks at set intervals. Run rates appear in your portal daily.

Rate · to 1,200 pcs/day
06

Inspection, kitting, ship

Final inspection, certificates packed with the parts, crated to your spec and released to your carrier or ours.

Docs · CoC + material certs
From the buyers

What supply chain teams say after the first year.

“

We moved four part numbers across as a test. They found a setup we had been paying for since 2016 and quietly removed it. The rest of the family followed within a quarter.

Dana Whitlock
Dana Whitlock Supply chain lead, energy OEM
“

Our launch date never moved. When a casting supplier slipped two weeks they re-sequenced the cell and told us before we noticed it ourselves.

Ibrahim Nasser
Ibrahim Nasser Program manager, EV platform
“

Their first article package arrived cleaner than our own template. Audit day took three hours instead of two days and nothing came back open.

Priya Raghunathan
Priya Raghunathan Quality director, aerospace tier 1
“

They quoted a job on Thursday and had a fixture on the machine the following Wednesday. Nobody else on our list moves at that speed and still passes first article.

Tomas Berglund
Tomas Berglund Head of sourcing, rail systems
“

The portal is the part my planners actually care about. They see run rates every morning and stopped chasing me for status calls.

Adaeze Okonkwo
Adaeze Okonkwo Operations director, hydro
“

A weldment came back out of flat once in three years. They collected it, rebuilt it and sent the root cause before we had raised the complaint formally.

Marcus Feld
Marcus Feld Buyer, infrastructure group
Request for quote

Send the print. We'll tell you what it costs and what we'd change.

Upload a STEP, IGES or PDF with quantities and target dates. An engineer replies within two business days — not a form robot.