Get a quote
Every stage

Pick the stage
your program is in.

Prototype, launch, production, aftermarket — different problems, different teams. Pick the stage you're in.

All service lines
Wide view of a factory floor with machinery and staged crates

Precision CNC Machining

  • 5-axis envelope to 1,200 mm
  • Held to ±0.0002 in
  • Lights-out third shift
Read more

Sheet Metal & Heavy Fabrication

  • Fibre laser to 1 in mild steel
  • 400-ton brake, 14 ft bed
  • AWS D1.1 certified welders
Read more

Robotic Welding Cells

  • Aluminium, steel and stainless
  • Weld map recorded per part serial
  • In-cell dye penetrant check
Read more

Finishing & Coating

  • Type II and Type III anodize
  • Salt-spray tested to 1,000 hours
  • Colour matched to RAL
Read more
In-house processes

Six capabilities, one quality record.

Every process below is owned in-house and measured against the same print. Nothing leaves the building for a step we can do ourselves.

Instant estimate

Get a number before
you get a quote.

Pick a process, a material and a quantity. This gives you the indicative unit band and lead time we would open a conversation with — the same logic our estimators start from before they open your file.

  • Ranges reflect current mill pricing and our live floor loading.
  • A firm quote comes back within two business days of your print.
  • No minimum order on prototype and first-article work.

Estimate a job

Indicative unit —
Lead time —

Indicative only. Geometry, tolerance and finish move the number — send the print and we'll firm it up.

Send this print to an engineer
Print to pallet

Six gates, and you can
see where your job sits.

Every job moves through the same six gates. You get a named engineer at gate one, and the same person answers at gate six.

01

Print review and quote

Send a STEP file or a PDF. An engineer reviews the GD&T, flags anything that will fight the process, and prices it.

Turnaround · 2 days
02

Design for manufacturing

We propose changes that cut cost without touching function — a radius here, one less setup there. You approve each one.

Turnaround · 3 days
03

Tooling and fixturing

Programs written, fixtures cut in-house, cycle proven on a dry run before a single piece of your material is touched.

Turnaround · 5 days
04

First article and sign-off

One part, fully measured, with a dimensional report against every ballooned feature. Production waits for your approval.

Turnaround · 4 days
05

Production run

Scheduled against your release dates with in-process checks at set intervals. Run rates appear in your portal daily.

Rate · to 1,200 pcs/day
06

Inspection, kitting, ship

Final inspection, certificates packed with the parts, crated to your spec and released to your carrier or ours.

Docs · CoC + material certs
Common questions

Answers we give
every week.

There isn't one for prototypes and first articles — we quote single pieces every week. For production the economics usually start making sense around fifty units, and we will tell you honestly when a job belongs at a different shop.

Two business days for a standard machined or fabricated part, five for a multi-process assembly. If you need a number faster, call and we will give you a bracketed estimate on the phone.

STEP and IGES for geometry, PDF for the dimensioned print. Native SolidWorks and Inventor files are fine too. If all you have is a sample part, send it and we will reverse-engineer it on the CMM.

Yes. Most production customers run a kanban or a blanket order with monthly releases. We hold finished goods in our warehouse and invoice on release rather than on build.

We are ITAR registered with a segregated area and access-controlled data handling. Send the classification along with the print and we will confirm before quoting.

Ship it back at our cost. You get a containment response within 24 hours, a root cause within five working days, and the corrective action documented in your portal. It has happened eleven times in three years and we publish the number.

Request for quote

Send the print. We'll tell you what it costs and what we'd change.

Upload a STEP, IGES or PDF with quantities and target dates. An engineer replies within two business days — not a form robot.