The boom opens where the map says pressure sits and closes everywhere else. Same load in the tank, considerably more ground behind you.
A blanket pass treats your worst corner and your cleanest strip identically. On most ground that means about a third of the tank lands on plants that were fine to begin with — and you paid for all of it.
Nothing rolls across the soil, so there are no tracks, no pinch rows and no compaction. In a wet spring that is often the only way a field gets treated inside its window at all.
What the contract covers
Rate file built from your own imagery, not a generic prescription
Boom shuts over headlands, drains and buffer strips automatically
Wind speed, heading and nozzle state logged second by second
Response flight 7 to 10 days after every treatment
Product sourced at cost with the supplier invoice attached